Project summary

Whitestones Solar Limited have submitted a planning application for a 9.9MW solar farm on farmland for a period of 40 years at Land at Whitestones, Cumniestown, Aberdeenshire.

The proposed development will:

  • Generate approximately 11GWh clean renewable electricity from solar irradiation every year.
  • Comprise circa 20,000 to 21,000 solar panels mounted on racks and arranged in rows with gaps to ensure limited shading covering approximately 33 acres including associated substation infrastructure.
  • The planning consent would be requested for a 40-year period.
  • On reaching the end of its operational life, the proposed solar development will be decommissioned, and the site restored.

View the proposed location and layout plan.

Layout Plan Location Plan

Survey form

Should you wish to provide feedback to the developer, please complete the below survey form

Please note that partaking in this process does not affect your statutory rights to make representations to Aberdeenshire Council in respect of the planning application.

"*" indicates required fields

This field is hidden when viewing the form

Next Steps: Install the Survey Add-On

This form requires the Gravity Forms Survey Add-On. Important: Delete this tip before you publish the form.
1. Do you agree that in the UK we should be developing renewable energy to help address the global climate emergency?*
2. Do you agree that using solar power to generate renewable electricity is a useful way of reducing emissions?*
3. Do you agree that the proposed solar development at Whitestones provides an opportunity to contribute to the demand for electricity in the surrounding area?*
4. If a planning application was submitted for the proposed solar development at Whitestones would you be most likely to;*
5b. If these changes were included would this alter the answer you gave to Question 4?*
Name*
Would you like to receive updates about Whitestones Solar Project?*